Fixing and Packing
For the last two weeks I have been working full time performing a major inspection on this airplane. During this time, I completely gutted the interior, change most of the control cables, pulleys, and also worked on the tail.
In these pictures I am removing the elevator. More specifically I am removing the whole tail to fix some corrosion that we found.

2 Comments:
The pile is growing! :) So was this a six? I'm working on a 19 for India. Started on Wednesday, and it's going to be down for a while. Gotta change a gear casting too! :(
Actually it is a 13. For the 185 the 13 is the big one where we loosen all the cables to inspect them. The tail was only a minor inspection, but to troubleshoot a loose stabilator we decided to pull the tail apart too. Turns out the looseness was probably due to a loose bracket.
Charlie Brown is up for a 19 this week. It will be the first one ever where we have been able to pull the gear. We have never had the facilities before.